DBB valve Bidding---2009-11-05
1, qualified bidders
1, bid requests for registration in the PRC, with independent legal person qualification; legally and financially independent, lawful operation and an independent person in the tender (tender bodies) manufacturers; the applicant and property in good condition and not in property was taken over , bankruptcy, or other off, stop, and, transfer the state; in the last three years there is no contract with the fraud as well as other economic offenses.
2 require manufacturers directly to tender, do not accept the trading company as a proxy bid.
3, the bidders registered capital of not less than (with) 15 million yuan.
4, bidders bidding products, professional design, manufacturing, and other qualifications, ball last three years, total sales of at least 100 million, and accounting for companies selling products last three years, the proportion of the total to reach 50%.
5, bidders are bidding products or similar products, the valve manufacturer should API6D authorization, there are pairs of truncated double-discharge and dual piston effect of the dbb valve seat production technology, there are nearly five years class400 16 "or more valve in the oil and gas pipelines (pipe pressure 6MPa (inclusive) above, the length of 200 km and above) the production, manufacture and application performance.
6, tender 16 "and above all welded dbb valves of the bidder must have the last five years class40026" and above all welded ball valves production and in oil and gas pipelines in the practical application of results.
Second, tender situations
1. Tender: West-East Gas Pipeline Project second-western section of 10 "and the following ball, and Shibuya ninglam gas pipeline valve double-track project tender.
Shibuya Cullinan began with double-track project in eastern Qaidam Basin in Qinghai Lake region 3 Sebei gas field on the 1st set of gas station near the old line Shibuya Shibuya ninglam the first stop on the north and east to Lanzhou Xigu District F35 # valve chamber, the line was the West east direction, the line length of 921.4km. Through Qinghai and Gansu provinces, 13 cities, districts and counties. Shibuya ninglam double-track design pressure of 6.3MPa (gauge pressure), trunk diameter §¶660mm. Seven stations along the line games (of which four compressor stations), 35 valve chambers (of which 16 RTU valve chambers).
2. Tendering name of the device, quantity:
No. Name Tender No. Project No. Equipment Name Specification Package Type the number of units
1 2008XM-SNLFX & XQDS Άς-GKZB-01 Shibuya ninglam gas pipeline double-track project B116 "more than one full welded dbb valve (including the executing agency) sets of 102
1, bid requests for registration in the PRC, with independent legal person qualification; legally and financially independent, lawful operation and an independent person in the tender (tender bodies) manufacturers; the applicant and property in good condition and not in property was taken over , bankruptcy, or other off, stop, and, transfer the state; in the last three years there is no contract with the fraud as well as other economic offenses.
2 require manufacturers directly to tender, do not accept the trading company as a proxy bid.
3, the bidders registered capital of not less than (with) 15 million yuan.
4, bidders bidding products, professional design, manufacturing, and other qualifications, ball last three years, total sales of at least 100 million, and accounting for companies selling products last three years, the proportion of the total to reach 50%.
5, bidders are bidding products or similar products, the valve manufacturer should API6D authorization, there are pairs of truncated double-discharge and dual piston effect of the dbb valve seat production technology, there are nearly five years class400 16 "or more valve in the oil and gas pipelines (pipe pressure 6MPa (inclusive) above, the length of 200 km and above) the production, manufacture and application performance.
6, tender 16 "and above all welded dbb valves of the bidder must have the last five years class40026" and above all welded ball valves production and in oil and gas pipelines in the practical application of results.
Second, tender situations
1. Tender: West-East Gas Pipeline Project second-western section of 10 "and the following ball, and Shibuya ninglam gas pipeline valve double-track project tender.
Shibuya Cullinan began with double-track project in eastern Qaidam Basin in Qinghai Lake region 3 Sebei gas field on the 1st set of gas station near the old line Shibuya Shibuya ninglam the first stop on the north and east to Lanzhou Xigu District F35 # valve chamber, the line was the West east direction, the line length of 921.4km. Through Qinghai and Gansu provinces, 13 cities, districts and counties. Shibuya ninglam double-track design pressure of 6.3MPa (gauge pressure), trunk diameter §¶660mm. Seven stations along the line games (of which four compressor stations), 35 valve chambers (of which 16 RTU valve chambers).
2. Tendering name of the device, quantity:
No. Name Tender No. Project No. Equipment Name Specification Package Type the number of units
1 2008XM-SNLFX & XQDS Άς-GKZB-01 Shibuya ninglam gas pipeline double-track project B116 "more than one full welded dbb valve (including the executing agency) sets of 102