Industry News
Left the sea pumping station into use ---2009-10-31
Fuzhou News 23 News reporter was informed that the bus station is located in mountain and ocean view of the sea near the pumping station has recently begun to the left temporary pumping, pumping sewage 15000 per day to 1.8 million tons.
In addition, the city construction, urban management and law enforcement, environmental protection department and other departments are collaborating with the Drum Tower area departments, and actively promote the West Lake, left water environment improvement work. At present, the West Lake, left the sea surrounding areas would be implemented to 148 units and residential sewage connections are already connected to the completion of 122, and another 22 under construction. Copper wire path 1640 meters of sewage trunk pipes 11 caisson and the river seven river trombone, seven wells and the Second Ring Road connecting the West-east water, the 1,700-meter-long pressure pipe has been completed.
In addition, the city construction, urban management and law enforcement, environmental protection department and other departments are collaborating with the Drum Tower area departments, and actively promote the West Lake, left water environment improvement work. At present, the West Lake, left the sea surrounding areas would be implemented to 148 units and residential sewage connections are already connected to the completion of 122, and another 22 under construction. Copper wire path 1640 meters of sewage trunk pipes 11 caisson and the river seven river trombone, seven wells and the Second Ring Road connecting the West-east water, the 1,700-meter-long pressure pipe has been completed.


